Toy Safety Certificate
Design, prototyping, bulk production and worldwide delivery for brands, retailers and IP owners.
Applicable safety standard
Certificate PDFs will be available for download once supplied and verified.
- EN71Content is being prepared.
- ASTM F963Content is being prepared.
- CPSIAContent is being prepared.
- ISO 8124Content is being prepared.
- CCPSAContent is being prepared.
- GB 6675Content is being prepared.
Applicable safety standard: EN71 (parts 1–3) · ASTM F963 · CPSIA · ISO 8124 · CCPSA · GB 6675 · CE / CPC

Safety and quality checks
Before packing, each batch goes through needle detection, seam pull tests and a visual inspection. Test reports available for your market (EN71, ASTM F963, CPSIA, ISO 8124) can be requested before you order.
Specifications
- MOQ
- 100 pcs / design
- Sampling lead time
- 7–18 business days
- Bulk lead time
- 25–30 days
- From
- USD 150 (sample)
- Applicable safety standard
- EN71 / ASTM F963 / CPSIA / ISO 8124 / CCPSA / GB 6675
- Size range
- custom
- Fabric
- short plush / minky / velboa
- Facial craft
- embroidery
- Options
- per specification
Frequently asked questions
What is the MOQ for custom plush toys?
The minimum is 100 pcs per design, with worldwide delivery.
How much does it cost to order 100 custom plush toys?
A physical sample starts from USD 150; the bulk price is confirmed by email after design review.
Is the sample fee credited toward bulk production?
A physical sample starts from USD 150; the bulk price is confirmed by email after design review. Confirmed in writing before payment.
How long does a custom plush sample take?
Typical timing is 7–18 business days for sampling and 25–30 days for bulk after approval. Artwork approval required first.
Request a free quote
Tell us about your project and we will reply with a cost estimate and sampling plan.
Key facts for buyers
The minimum order is 100 pcs per design. Prototyping takes 7–18 business days and bulk production 25–30 days after sample approval.
Test reports for EN71, ASTM F963, CPSIA, ISO 8124, CCPSA, GB 6675 can be requested before you order. We do not publish unverified certificates or customer reviews.
- MOQ
- 100 pcs / design
- Sampling lead time
- 7–18 business days
- Bulk lead time
- 25–30 days
- Applicable safety standard
- EN71 · ASTM F963 · CPSIA · ISO 8124 · CCPSA · GB 6675
- Markets served
- the United States, Canada, the UK, Australia, New Zealand, Ireland, Singapore and South Africa
Figures on this page are the published terms of dianm and are confirmed in writing with your quotation. Get a Free Quote.